Planning blog
Props:
The props I will be using will mainly consist of the hand sanitizing bottle and many different surfaces and places to show how you interact with bacteria throughout the day
Costumes:
The costumes I will be using will be very basic and consist of day to day clothing. My actor(s) will be in jeans and a regular t-shirt and maybe another actor in scrubs. If I couldn’t obtain the scrubs For the other actor they would be in the same attire as the other actor(s).
Schedule:
On 09/23/21, I will research conventions and codes of hand sanitizing commercials. I will also establish props, costumes, schedule location, list, and back up plan.
On 09/29/21, I will create the storyboard for the 30 second Purell commercial.
On 10/1/21 and 10/5/21, I will film and record the necessary shots for the commercial
On 10/7/11 and 10/11/21, I will edit and add the final touches to the commercial
Location list:
The main location will be the hallway upstairs closest to the media center. I will film the actors walking and someone sneezing, to show the need of hand sanitizer in the world right now
Back up plan:
If it starts to rain or anything I will start to film the commercial inside the classroom. We would film the need of hand sanitizer in a classroom setting. If one of my people is missing I will then decide to switch my actors and cameraman/camerawoman around.
No comments:
Post a Comment